Well, the bottom and footings are very nearly done. Once I had all the base plates in position I concentrated on pulling the front sides in just back of the front bulkhead. It was 7' 1" wide on the knuckle. By slitting it just above the top guard I have managed to pull each side in 1", it will now go almost anywhere on the system.
Now all I have to do is 9' of footings, then I can start doing the knees. I hope each one doesn't take too long as I have 16 to take out, replace the bad plate and weld the knees back in.